{"product_id":"1-2w-framed-solar-panel-6v-dc5521-long-lead","title":"1.2W Framed Solar Panel, 6V with Long DC5521 Lead","description":"\u003ch2\u003eKey Features\u003c\/h2\u003e\u003cul\u003e\n\u003cli\u003e1.2W panel with 6V working output\u003c\/li\u003e\n\u003cli\u003eDC5521 plug on an approximately 2.8–3m lead\u003c\/li\u003e\n\u003cli\u003e84 × 130 × 10mm white plastic frame\u003c\/li\u003e\n\u003cli\u003eRear mounting slots for attachment\u003c\/li\u003e\n\u003cli\u003eApproximately 100g panel weight\u003c\/li\u003e\n\u003c\/ul\u003e\u003cfigure class=\"product-enrichment-image product-enrichment-image--feature\"\u003e\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/0685\/7582\/2024\/files\/1-2w-84x130x10-solar-dc5521-white-rear-d05.jpg?v=1792484093\" alt=\"1.2W framed solar panel — white rear and mounting slots\" loading=\"lazy\"\u003e\u003c\/figure\u003e\u003cfigure class=\"product-enrichment-image product-enrichment-image--feature\"\u003e\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/0685\/7582\/2024\/files\/1-2w-84x130x10-solar-dc5521-long-dc-d06.jpg?v=1792484097\" alt=\"1.2W framed solar panel — long DC lead\" loading=\"lazy\"\u003e\u003c\/figure\u003e\u003cfigure class=\"product-enrichment-image product-enrichment-image--feature\"\u003e\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/0685\/7582\/2024\/files\/1-2w-84x130x10-solar-dc5521-rear-mounting-d08.jpg?v=1792484108\" alt=\"1.2W framed solar panel — rear mounting detail\" loading=\"lazy\"\u003e\u003c\/figure\u003e\n\u003ch2\u003eProduct Overview\u003c\/h2\u003e\u003cp\u003eThe 1.2W framed solar panel uses a compact white plastic housing and a long DC5521 lead for a compatible 6V circuit. Its rear mounting slots provide attachment points while the 84 × 130mm cell face collects sunlight. The cable measures approximately 2.8–3m, allowing separation between the panel and connected equipment.\u003c\/p\u003e\u003cfigure class=\"product-enrichment-image product-enrichment-image--overview\"\u003e\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/0685\/7582\/2024\/files\/1-2w-84x130x10-solar-dc5521-module-and-d03.jpg?v=1792484083\" alt=\"1.2W framed solar panel — module and lead\" loading=\"lazy\"\u003e\u003c\/figure\u003e\u003cfigure class=\"product-enrichment-image product-enrichment-image--overview\"\u003e\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/0685\/7582\/2024\/files\/1-2w-84x130x10-solar-dc5521-framed-cell-d04.jpg?v=1792484089\" alt=\"1.2W framed solar panel — framed cell face\" loading=\"lazy\"\u003e\u003c\/figure\u003e\n\u003ch2\u003eDetails \u0026amp; Specs\u003c\/h2\u003e\u003ctable\u003e\u003ctbody\u003e\n\u003ctr\u003e\n\u003cth\u003eRated panel power\u003c\/th\u003e\n\u003ctd\u003e1.2W\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eWorking voltage\u003c\/th\u003e\n\u003ctd\u003e6V\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eDimensions\u003c\/th\u003e\n\u003ctd\u003e84 × 130 × 10mm\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eCell \/ surface\u003c\/th\u003e\n\u003ctd\u003ePolycrystalline silicon in a plastic frame\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eConnection\u003c\/th\u003e\n\u003ctd\u003eDC5521 plug; approximately2.8–3m lead\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eOutput current\u003c\/th\u003e\n\u003ctd\u003e0–200mA\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eShort-circuit current\u003c\/th\u003e\n\u003ctd\u003e210mA\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003ePanel weight\u003c\/th\u003e\n\u003ctd\u003eApproximately 100g\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003cth\u003eIncluded\u003c\/th\u003e\n\u003ctd\u003e1 framed solar panel with attached DC5521 lead\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\u003c\/table\u003e\u003cfigure class=\"product-enrichment-image product-enrichment-image--specification\"\u003e\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/0685\/7582\/2024\/files\/1-2w-84x130x10-solar-dc5521-6v-module-d07.jpg?v=1792484103\" alt=\"1.2W framed solar panel — 6V module dimensions\" loading=\"lazy\"\u003e\u003c\/figure\u003e\n\u003ch2\u003eCompatibility \u0026amp; Notes\u003c\/h2\u003e\u003cp\u003eMatch working voltage, connector dimensions and polarity to your circuit. Battery charging requires a separate compatible charge controller. Available output depends on direct sunlight and load.\u003c\/p\u003e","brand":"LinkSolar","offers":[{"title":"Default Title","offer_id":45232904798408,"sku":"SP-A00211-001","price":18.74,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0685\/7582\/2024\/files\/1-2w-84x130x10-solar-dc5521-small-framed-g01.webp?v=1792484019","url":"https:\/\/linksolar.net\/nl\/products\/1-2w-framed-solar-panel-6v-dc5521-long-lead","provider":"LinkSolar","version":"1.0","type":"link"}