1.2W Framed Solar Panel, 6V with Long DC5521 Lead
1.2W Framed Solar Panel, 6V with Long DC5521 Lead ...è stato ordinato al fornitore e verrà spedito non appena sarà di nuovo disponibile.
Caratteristiche
Caratteristiche
1.2W Framed Solar Panel, 6V with Long DC5521 Lead ...è stato ordinato al fornitore e verrà spedito non appena sarà di nuovo disponibile.
Key Features
- 1.2W panel with 6V working output
- DC5521 plug on an approximately 2.8–3m lead
- 84 × 130 × 10mm white plastic frame
- Rear mounting slots for attachment
- Approximately 100g panel weight



Product Overview
The 1.2W framed solar panel uses a compact white plastic housing and a long DC5521 lead for a compatible 6V circuit. Its rear mounting slots provide attachment points while the 84 × 130mm cell face collects sunlight. The cable measures approximately 2.8–3m, allowing separation between the panel and connected equipment.


Details & Specs
| Rated panel power | 1.2W |
|---|---|
| Working voltage | 6V |
| Dimensions | 84 × 130 × 10mm |
| Cell / surface | Polycrystalline silicon in a plastic frame |
| Connection | DC5521 plug; approximately2.8–3m lead |
| Output current | 0–200mA |
| Short-circuit current | 210mA |
| Panel weight | Approximately 100g |
| Included | 1 framed solar panel with attached DC5521 lead |

Compatibility & Notes
Match working voltage, connector dimensions and polarity to your circuit. Battery charging requires a separate compatible charge controller. Available output depends on direct sunlight and load.




