1.2W Framed Solar Panel, 6V with Long DC5521 Lead
1.2W Framed Solar Panel, 6V with Long DC5521 Lead est en rupture de stock et sera expédié dès qu’il sera de retour en stock.
Caractéristiques
Caractéristiques
1.2W Framed Solar Panel, 6V with Long DC5521 Lead est en rupture de stock et sera expédié dès qu’il sera de retour en stock.
Key Features
- 1.2W panel with 6V working output
- DC5521 plug on an approximately 2.8–3m lead
- 84 × 130 × 10mm white plastic frame
- Rear mounting slots for attachment
- Approximately 100g panel weight



Product Overview
The 1.2W framed solar panel uses a compact white plastic housing and a long DC5521 lead for a compatible 6V circuit. Its rear mounting slots provide attachment points while the 84 × 130mm cell face collects sunlight. The cable measures approximately 2.8–3m, allowing separation between the panel and connected equipment.


Details & Specs
| Rated panel power | 1.2W |
|---|---|
| Working voltage | 6V |
| Dimensions | 84 × 130 × 10mm |
| Cell / surface | Polycrystalline silicon in a plastic frame |
| Connection | DC5521 plug; approximately2.8–3m lead |
| Output current | 0–200mA |
| Short-circuit current | 210mA |
| Panel weight | Approximately 100g |
| Included | 1 framed solar panel with attached DC5521 lead |

Compatibility & Notes
Match working voltage, connector dimensions and polarity to your circuit. Battery charging requires a separate compatible charge controller. Available output depends on direct sunlight and load.




